Sunday, 30 October 2011

ISRO LAUNCH VEHICLES



The Polar Satellite Launch Vehicle,usually known by its abbreviation PSLV is the first operational launch vehicle of ISRO. PSLV is capable of launching 1600 kg satellites in 620 km sun-synchronous polar orbit and 1050 kg satellite in geo-synchronous transfer orbit. In the standard configuration, it measures 44.4 m tall, with a lift off weight of 295 tonnes. PSLV has four stages using solid and liquid propulsion systems alternately. The first stage is one of the largest solid propellant boosters in the world and carries 139 tonnes of propellant. A cluster of six strap-ons attached to the first stage motor, four of which are ignited on the ground and two are air-lit.
The reliability rate of PSLV has been superb. There had been 19 continuously successful flights of PSLV, till October 2011 . With its variant configurations, PSLV has proved its multi-payload, multi-mission capability in a single launch and its geosynchronous launch capability. In the Chandrayaan-mission, another variant of PSLV with an extended version of strap-on motors, PSOM-XL, the payload haul was enhanced to 1750 kg in 620 km SSPO. PSLV has rightfully earned the status of workhorse launch vehicle of ISRO.
Typical Parameters of PSLV
 Lift-off weight295 tonne
 Pay Load1600 kg in to 620 km Polar Orbit,
1060 kg in to Geosynchronous Transfer Orbit (GTO)
 Height44 metre
PSLV Milestones
PSLV-C18 launched Megha-TropiquesSRMSatVesselSat-1 and Jugnu on October 12, 2011 (Successful)
PSLV-C17 launched GSAT - 12 on July 15, 2011 (Successful)
PSLV-C16 launched RESOURCESAT - 2YOUTHSAT and X-SAT on April 20, 2011 (Successful)
PSLV-C15 launched CARTOSAT-2BALSAT-2ANLS 6.1 & 6.2 and STUDSAT on July 12, 2010 (Successful)
PSLV-C14 launched Oceansat - 2 and Six Nanosatellites on September 23, 2009 (Successful)
PSLV-C12 launched RISAT-2 and ANUSAT on April 20, 2009 (Successfully)
PSLV-C11 launched CHANDRAYAAN-I, on October 22, 2008 (Successful)
PSLV-C9 launched CARTOSAT-2AIMS-1 and Eight nano-satellites on April 28, 2008 (Successful)
PSLV-C10 launched TECSAR on January 23, 2008 (Successful)
PSLV-C8 launched AGILE on April 23, 2007 (Successful)
PSLV-C7 launched CARTOSAT-2SRE-1LAPAN-TUBSAT and PEHUENSAT-1 on January 10, 2007 (Successful)
PSLV-C6 launched CARTOSAT-1 and HAMSAT on May 5, 2005 (Successful)
PSLV-C5 launched RESOURCESAT-1(IRS-P6) on October 17, 2003 (Successful)
PSLV-C4 launched KALPANA-1(METSAT) on September 12, 2002 (Successful)
PSLV-C3 launched TES on October 22, 2001 (Successful)
PSLV-C2 launched OCEANSAT(IRS-P4)KITSAT-3 and DLR-TUBSAT on May 26, 1999 (Successful)
PSLV-C1 launched IRS-1D on September 29, 1997 (Successful)
PSLV-D3 launched IRS-P3 on March 21, 1996 (Successful)
PSLV-D2 launched IRS-P2 on October 15, 1994 (Successful)
PSLV-D1 launched IRS-1E on September 20, 1993 (Unsuccessful)



The GSLV-III or Geosynchronous Satellite Launch Vehicle Mark III , is a launch vehicle currently under development by the Indian Space Research Organization. GSLV Mk III is conceived and designed to make ISRO fully self reliant in launching heavier communication satellites of INSAT-4 class, which weigh 4500 to 5000  kg. It would also enhance the capability of the country to be a competitive player in the multimillion dollar commercial launch market. The vehicle envisages multi-mission launch capability  for GTO, LEO, Polar and intermediate circular orbits.
GSLV-Mk III is designed to be a three stage vehicle, with 42.4 m tall with a lift off weight of 630 tonnes. First stage comprises two identical S200 Large Solid Booster (LSB) with 200 tonne solid propellant, that are strapped on to the second stage, the L110 re-startable liquid stage. The third stage is the C25 LOX/LH2 cryo stage. The large payload fairing measures 5 m in diameter and can accommodate a payload volume of 100 cu m. The development work on Mk III is progressing as per schedule for a launch in 2012.
Typical Parameters of GSLV Mark III
 Lift-off weight630 Tonne
 Pay Load4 Tonne in to Geosynchronous Transfer Orbit (GTO)
 Height42.4 metre
Geosynchronous Satellite Launch Vehicle(GSLV)-Mark I&II ,is capable of placing INSAT–II class of satellites (2000 – 2,500 kg) into Geosynchronous Transfer Orbit (GTO).  GSLV is a three stage vehicle GSLV is 49 m tall, with 414 t lift off weight. It has a maximum diameter of 3.4 m at the payload fairing. First stage comprises S125 solid booster with four liquid (L40) strap-ons.  Second stage (GS2) is liquid engine and the third stage (GS3) is a cryo stage.   The vehicle develops a lift off thrust  of 6573 kn. 
The first flight of GSLV took place from SHAR on April 18, 2001 by launching 1540 kg GSAT-1. It was followed by six more launches , GSLV-D2 on May 8, 2003 (GSAT-2  1825 kg), GSLV-F01 on September 20, 2004 (EDUSAT 1950 kg), GSLV-F02 on July 10, 2006, GSLV-F04 on September 2, 2007 (INSAT-4CR   2130 kg), GSLV-D3 on April 15, 2010 and GSLV-F06 on December 25, 2010.
Typical Parameters of GSLV
 Lift-off weight414 tonne
 Pay Load2 to 2.5 Tonne in to Geosynchronous Transfer Orbit (GTO)
 Height49 metre
GSLV Milestones
GSLV-F06 launched GSAT-5P on December 25, 2010 (Unsuccessful)
GSLV-D3 launched GSAT-4 on April 15, 2010 (Unsuccessful)
GSLV-F04 launched INSAT-4CR on September 2, 2007 (Successful)
GSLV-F02 launched INSAT-4C on July 10, 2006 (Unsuccessful)
GSLV-F01 launched EDUSAT(GSAT-3) on September 20, 2004 (Successful)
GSLV-D2 launched GSAT-2 on May 8, 2003 (Successful)
GSLV-D1 launched GSAT-1 on April 18, 2001 (Successful)

No comments:

Post a Comment